Instructions for the maintenance kit heat Pumps.
Preparation:
Turn off the heating plant.
Shake the bottle.
Fit the filler hose onto the bottle. Check that the valve is turned up (turn counterclockwise).
Locate the service port on your heating-plant. It is usually in the vicinity of the connections on the out-part. Usually it is a plastic cover easily screws off for accessing the service port.
Screw the filler hose onto the service port (lågtryckssidan). It is always the port on the tube with the coarsest diameter.
If you have gas in the system the pressure will be high, perhaps all the way into the yellow on the meter.
Ask someone to start the heating plant, now the pressure will drop. Let the plant work for about 5 minutes in the COOLING mode. Read off the pressure. Is the pressure too low, fill with gas with the bottle up and down. Turning now the dial clockwise, so the streams of gas into the system. Aternativt the button is pressed, depending on the type of serviceslang you have. When the meter displays in the middle of the blue bar is filling is ready.
Mount the loose filler hose from the plant.
Mount back the plastic cover on the plant.
Clear!
Trycktabell for r410a are Listed in the BAR
Temp C - BAR
-10,0 4,73
-9,00 4,93
-8,00 5.13 the
-7,00 5,34
-6,00 5,56
-5,00 5.78 for
-4,00 6,01
-3,00 6,24
-2,00 6,48
-1,00 6,73
0,00 6,98
1,00 7,24
2,00 7,50
3,00 7,77
4,00 8,05
5,00 8,33
6,00 eur 8.62
7,00 range 8.92
8,00 9,2
From 9.00 to 9.5
10,0 9,8
11,0 10,2
12,0 10,5
13,0 10,8
14,0 11,2
15,0 11,5
16,0 11,9
17,0 12,3
18,0 12,7
19,0 13,0
20,0 13,4
21,0 13,8
22,0 14,2
23,0 14,7
24,0 15,1
25,0 15,5
26,0 16,0